projects Highway UrbanIndustrialConstruction
 

 

  March 2010

Project Title: Derry City Centre Public Realm Scheme

  • Project Title: Derry City Centre Public Realm Scheme

    The Challenge: Provide fast setting bedding concretes, mortars and grouts for 16,000m² of natural stone paving to busy city centre regeneration project, requiring rapid trafficking of urban precincts.

    The Solution: Emtek provided their Ultrascape cementitious materials, pre-blended in 20T silo’s and also in convenient 25kg bags. Being fully compliant with the required BS: 7533 (part 12), it was ideal for areas requiring rapid trafficking or weekend works. The historical walled city of Derry required the full complement of Emtek Ultrascape materials, from our Pro-Prime slurry primer and Pro-Bed HS bedding concrete, to our Flow-Point rapid setting flowable grout system. Our ability to provide technical site support and carry buffer stocks of materials at our warehouse proved invaluable during busy periods of high output paving.

    For further information contact our Urban Team:
    sales@emtek.co.uk
    [top]

February 2010

Project Title: N52 Tullamore By-Pass, Co. Offaly

  • Project Title: N52 Tullamore By-Pass, Co. Offaly

    The Challenge:
    Provide High Containment Bridge Parapet and Safety Barrier systems for the construction of a new 15 kilometre stretch of carriageway through the midlands region of Ireland.

    The Solution:
    Emtek provided their Very High Containment H4a & N2 Protect 365 Steel Parapets to offer containment for the main Dublin-Athlone Railway Line, across 6 structures. These were joined seamlessly to our VT-100 Transitions, providing the link to our N2 Safety Barriers and Terminals. Our Contracts and Production teams worked closely with the main contractor to ensure the scheme was delivered 10 months ahead of schedule and on budget. In total some 9 kilometres of Road Restraint Systems were manufactured and installed by Emtek.

    For further information contact our Highway Team: sales@emtek.co.uk
    [top]

January 2010

Project Title: Carrigart Housing Scheme, Co. Armagh

  • Project Title: Carrigart Housing Scheme, Co. Armagh

    The Challenge: Provide cost effective roofing system to new housing development.

    The Solution: Emtek provided a durable concrete interlocking roof tile, on a non breathable underlay. With dry fix ridge, hip and verge also being used on the scheme, this eliminated the requirement for future mortar maintenance to these areas. Eave ventilation was also supplied and fitted by our experienced installers, as was the provision of all required Lead Flashings to the roofs. In total 7 No. houses were completed with this system and additional value added to the client as we also installed the Road Restraint Systems required on the site, highlighting our ability to provide integrated construction and infrastructure solutions.

    For further information contact our Construction Team: sales@emtek.co.uk